Sign In | Join Free | My entremaqueros.com |
|
Brand Name : Dehai Boiler
Model Number : Boiler Header
Certification : ISO9001 , SGS , ABS , ASME
Place of Origin : China
MOQ : 5 Tons
Price : Negotiable
Payment Terms : L/C, T/T
Supply Ability : 500 Tons / Month
Delivery Time : 50 Days
Packaging Details : Seaworthy packing
Type : Water tube
Pressure : High Pressure
Material : Carbon Steel / Alloy Steel
Output : Hot Water
Style : Horizontal
Fuel : Coal fired
Boiler Economizer Collecting Header Description
1. Headers form an important part of all types of boilers.
2. Steam from the generating tubes is collected in headers which are therefore always under pressure.
3. This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them.
4. Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.
Materials
1. Carbon steel:20G,SA-106B,SA-106C,etc.
2. Low-alloy thermal resistant steel:15CrMoG,12Cr1MoVG,SA-335P12,SA335-P22,etc.
3. Middle-alloy thermal resistant steel:SA-335P91,etc.
4. Special material(ultra-supercritical):SA-335P122,SA-335P92,etc.
Features
1.Headers form an important part of all types of boilers. Steam from the generating tubes is collected in headers which are therefore always under pressure. This pressure may vary from 300 psi to 2000 psi.
2. Since headers are always under pressure, the utmost care is taken by us while fabricating them. Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the headers
3. Bevelling and weld preparation of stubs duly tack-welded to the main body of the header are first shown to Chief Inspector of Boilers for his approval and once again the stubs fully welded with main body are shown to Chief Inspector of Boilers under hydraulic pressure, varying from 1000 to 3000 psi as required by the specifications.
4. The headers are stamped by Chief Inspector of Boilers before they leave our manufacturing plant. We also weld skubolets and weldolets in place of stubs.
Specification
Materials | Stainless Steel |
Type | header body, end cover, tube joint, hand cole, thermometer socket;seamless steel tube, pressure parts |
Advantages | advanced welding, safe and reliable operation |
Brand | Zhangjiagang Dehai Boiler |
Remarks | Customized order is also accepted. |
Material | Carbon steel,Alloy steel,Stainless steel. |
Length | According to costumes requirements. |
Temperature Range | 300℃~1500℃ |
Diameter(OD) | 76mm~914mm |
1 | Headers form an important part of all types of boilers. |
2 | Steam from the generating tubes is collected in headers which are therefore always under pressure. |
3 | This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them. |
4 | Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header |
Prepration
![]() |
Economizer Boiler Manifold Headers 100-600mm NB Size Economical Images |