Sign In | Join Free | My entremaqueros.com
China Zhangjiagang Dehai Boiler Co., Ltd logo
Zhangjiagang Dehai Boiler Co., Ltd
High quality for survival and perfect service for development.
Active Member

7 Years

Home > Boiler Membrane >

ISO Boiler Membrane Bare Tube With Bar At Two Sides Export Project Single Fin Bar Tube

Zhangjiagang Dehai Boiler Co., Ltd
Contact Now

ISO Boiler Membrane Bare Tube With Bar At Two Sides Export Project Single Fin Bar Tube

  • 1
  • 2
  • 3

Brand Name : Dehai Boiler

Model Number : Membrane single tube

Certification : ISO9001 , SGS , ABS , ASME

Place of Origin : China

MOQ : 1 Set

Price : Negotiable

Payment Terms : L/C, T/T

Supply Ability : 800 Tons / Month

Delivery Time : 30 Days

Packaging Details : Seaworthy packing

Application : Power plant

Fuel : Gas / Coal

Performance : Perfect quality

Tube material : Carbon Steel

Fin material : Carbon steel

Surface Treatment : Painted

Contact Now

Boiler bare tube with membrane bar at two sides export project single fin bar tube

Product information

1. The membrane wall is also called the membrane type water wall.

2. With a hose and flat steel welding of boiler furnace wall.

3. The size of each component according to the requirements of the whole loop pipe group welding and become, reoccupy welding seal between group and group when installation.

4. Make the furnace surrounded by a layer of the whole water wall closely surrounded by diaphragm.

Material composition

  • Material: generally is carbon steel and alloy steel.
  • The pipe diameter: 22-89 mm
  • The pipe wall thickness: 2-13 mm
  • Flat steel width: 8-120 - mm
  • Flat steel thickness: 3 -- 12 mm
  • Machining process: there is submerged arc welding and gas shielded welding.

Characteristic

1. The membrane wall of the furnace wall of protection is the most complete instead of refractory material.

2. Make the wall thickness and weight are greatly reduced, simplify furnace wall structure, reduce the total

weight of boiler 's membrane water wall has good air tightness, able to meet the requirements of positive

pressure combustion of boiler, not easy slagging, less air leakage.

3. Reduce exhaust smoke heat loss, improve the boiler thermal efficiency; By manufacturing welded components factory, install quickly and easily.

Details

Tube OD 25.4~219mm
Thickness 2~10m
Length 26000mm
Material Carbon steel/Cr-Mo alloy steel(T11,T22,T23,T91)/stainless steel
Fin Thickness 0.8~3mm
Width 10~30mm
Steel Sheet Material Carbon steel/low alloy steel/high alloy steel(11Cr)/austenitic stainless steel
Fin Tube Length 26000mm
Pitch

3.4~16m

(continuous adjustable)

Minimum Distance From Fin to Tube End 80mm
Fin Shape Spiral folded perforation
Welding Speed Not lower than 30m/min
Product display
ISO Boiler Membrane Bare Tube With Bar At Two Sides Export Project Single Fin Bar Tube
Welding Machine
ISO Boiler Membrane Bare Tube With Bar At Two Sides Export Project Single Fin Bar Tube

Product Tags:

water wall tubes

      

boiler wall unit

      
 ISO Boiler Membrane Bare Tube With Bar At Two Sides Export Project Single Fin Bar Tube Manufactures

ISO Boiler Membrane Bare Tube With Bar At Two Sides Export Project Single Fin Bar Tube Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhangjiagang Dehai Boiler Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)